The full fibre-network build chain.
We deliver every step of the build with our own teams — from the execution design, through earthworks, ADSS, blowing and splicing, to as-built documentation aligned with the client's OSS.
Nine disciplines,
one contractor.
We can deliver full scope or selected stages — both under the same SLA and reporting standard.
Earthworks (trenching)
Mechanical trenching, conduit laying with marker tape, manhole and cabinet installation. Plus pipe jacking under short obstacles and surface restoration.
- Mechanical trenching
- Pipe jacking
- Surface restoration
Aerial network
Installation on LV/MV poles. DSO (Distribution System Operator) approvals, cable labelling per DSO requirements.
- ADSS 48–144F
- LV/MV poles
Microcable blowing
12F–144F microcables in microducts, Plumett MultiJet and GMP equipment. Average speed 60 m/min.
- Microcables up to 144F
- Plumett · GMP
- 96 F / day
Fusion splicing & closures
Fujikura 90R/86S fusion splicers, DLH and IPLC closures. Every splice — bidirectional measurement, average below 0.03 dB attenuation.
- Fujikura 90R
- DLH/IPLC closures
- OTDR 1310/1550/1625
Network design
End-to-end construction and execution designs for fibre networks, technology and telecom ducts.
- Construction design
- Execution design
- Technology ducts
Power-line alterations
Alterations of existing power infrastructure under DSO approvals before fibre network rollout.
- DSO approvals
- Power poles
- LV line
ERTMS-GSM-R fibre network
Fibre networks for the ERTMS-GSM-R system in the railway corridor — PKP PLK approvals, track-window scheduling.
- PKP PLK
- Track windows
- Railway corridor
Own investments
We deliver our own FTTH projects — from coverage acquisition, through design and build, to infrastructure commercialisation.
- Own network
- Wholesale to operators
- White-label
B2B
Dedicated links and fibre-optic infrastructure for business — campuses, industrial parks, DC-to-DC connections.
- Dark fiber
- DC-to-DC
- Campuses / parks
Got a route
to build?
You receive a quote within 48 hours — including schedule, equipment list and dedicated contract manager.