Power-line alterations for fibre networks.

Alterations of existing power infrastructure — relocation of poles, cables and LV/MV lines — required before fibre route delivery in road and railway corridors.

When and why alterations are needed.

In many FTTH projects we encounter conflicts with existing power infrastructure — poles in the planned route, LV/MV cables crossing the planned fibre route, the need to adjust line height for ADSS. In such cases we deliver alterations in co-operation with the DSO and utility owners.

What we deliver

  • Approvals with DSOs (Enea, Energa, Tauron, PGE, ESV)
  • Technical design for alterations (industry permits)
  • Replacement / relocation of LV and MV power poles
  • Alteration of LV and MV cable lines
  • Adjustment of line height for ADSS installation
  • Electrical measurements and acceptance protocols

Co-operation with DSOs

We work either as an external contractor with DSO clearance or as an alteration investor with asset hand-over after delivery. In both cases we provide full documentation and acceptance protocols compliant with the Distribution System Operator internal procedures.

Got a route
to build?

You receive a quote within 48 hours — including schedule, equipment list and dedicated contract manager.

What's in the quote

Quote turnaround≤ 48 hours
Section-by-section scheduleyes
Equipment & crew listyes
Dedicated contactyes
Reporting standardClient's OSS