Power-line alterations for fibre networks.
Alterations of existing power infrastructure — relocation of poles, cables and LV/MV lines — required before fibre route delivery in road and railway corridors.
When and why alterations are needed.
In many FTTH projects we encounter conflicts with existing power infrastructure — poles in the planned route, LV/MV cables crossing the planned fibre route, the need to adjust line height for ADSS. In such cases we deliver alterations in co-operation with the DSO and utility owners.
What we deliver
- Approvals with DSOs (Enea, Energa, Tauron, PGE, ESV)
- Technical design for alterations (industry permits)
- Replacement / relocation of LV and MV power poles
- Alteration of LV and MV cable lines
- Adjustment of line height for ADSS installation
- Electrical measurements and acceptance protocols
Co-operation with DSOs
We work either as an external contractor with DSO clearance or as an alteration investor with asset hand-over after delivery. In both cases we provide full documentation and acceptance protocols compliant with the Distribution System Operator internal procedures.